Screed – in Switzerland usually called the subfloor (Unterlagsboden) – is the load-bearing, level floor layer applied over the structural slab that forms the base for the floor covering. It levels out unevenness, bears loads and often encases the pipes of underfloor heating.

The screed is an invisible but decisive layer in the floor structure. It lies between the structural slab (often with insulation and a separating layer) and the visible covering such as parquet, tiles or vinyl. Its job is to create a load-bearing, level and dimensionally accurate surface on which the covering can be laid cleanly. In most residential buildings the underfloor heating is also embedded in the screed.

There are mainly two construction methods. The classic cement screed is placed as an earth-moist mass, levelled off and smoothed – it is robust and inexpensive but takes a long time to dry out. Flowing screed (usually anhydrite/calcium sulphate based) is poured in liquid, levels itself almost automatically and produces a very even surface; it encases heating pipes particularly well and is ready for covering sooner.

The process: after laying insulation, edge insulation strips and – if present – heating pipes, the screed is placed in the planned thickness (typically 6 to 8 cm for cement, thinner for flowing screed) and levelled. This is followed by the crucial drying and curing phase. As a rough rule of thumb, cement screed needs about one week per centimetre of thickness, flowing screed considerably less. Only when the residual moisture is low enough may the covering be laid – otherwise damage may occur later.

Screed is needed in every new build and in larger renovations with a new floor structure. For pure covering changes, a levelling layer or a thin filler coat is often enough instead of a completely new screed.

Costs for flowing screed in Switzerland are usually around CHF 30 to 50 per m² (approx. 4.5 cm); for a complete subfloor including insulation and installation, more like CHF 50 to 100 per m² depending on structure and thickness (guide values, no guarantee).

Example

In a new build, insulation and the underfloor heating pipes are laid first, then the tradesperson pours a flowing screed that self-levels and fully encases the heating pipes. Once dried out, parquet is laid on top.

Compare providers & prices

Find matching providers and compare prices:

Frequently asked

How much does screed cost per m²?

Flowing screed in Switzerland usually costs around CHF 30 to 50 per m² (approx. 4.5 cm). A complete subfloor including insulation and installation is more like CHF 50 to 100 per m², depending on structure and thickness (no guarantee).

What is the difference between cement screed and flowing screed?

Cement screed is placed earth-moist, is robust and cheap but dries slowly (roughly one week per centimetre). Flowing screed is poured liquid, self-levels, produces a very even surface and is ready for covering sooner.

How long must screed dry before the covering is laid?

For cement screed reckon roughly one week per centimetre of thickness, for flowing screed usually much less. The measured residual moisture is decisive – only when it is low enough may the covering be laid.